PLANT INFRASTRUCTURE

Manufacturing Area – Hormones/Steroids

Two separate dedicated manufacturing areas for hormones and steroids


  • Purified Water System
  • Chemical Synthesis Workshop
  • Refining-Drying-Packing Workshop 
  • Raw Material Warehouse
  • Intermediate Warehouse
  • Finished Product Warehouse for Hormones
  • Finished Product Warehouse for Steroids

Quality Control Laboratory

  •   Retain sample room

  •   Stability testing chamber

  •   UV-2550

  •   FTIR-8400S

  •   Polarimeter


  •   HPLC Room

  •   Malvern Mastersizer

  •   Agilent GC

  •   Physical and chemical testing room 

Company EHS Management

    Health Management 
  • Body check yearly

  • Occupational health assessment 

  • Comprehensive labor protection measures


  • Safety Management
  • Process safe management 

  • Anti-static

  • Fire safety 


  • SMP/SOP
  • In terms of special operations, the company has improved the permit system and relevant forms (including fire, restricted space, power connection, etc.) to ensure the safety of related operations.


  • Company Environment Management 
  • Waste Water Treatment Plant (WWTP)

  • VOC Treatment 

  • Hazardous Waste Management

Quality Assurance

Quality Assurance

  • Process validation
  • Master Plan validation 
  • Equipment qualification
  • Cleaning validation
  • HVAC validation

Quality Assurance

  • Water system validation
  • Analytical validation
  • Change Control, Deviation, OOS Management
  • GMP Training  
  • Internal Audits

Phone

+86 187 1945 8789

Email

info@wahsunpharma.com

Skype/WhatsApp

+86 187 1945 8789

Office Location

Modern Industrial Centralization Zone, Xianju, Zhejiang, China.